WBZ500 stabilized soil mixing station (mixing station), also known as 500 concrete mixing station, can produce 500 tons /, is the advantages of our company's comprehensive domestic similar mixing equipment, combined with the actual needs of construction to produce a new type of road construction floor mat mixing equipment. The equipment is suitable for the construction of any high level highway, high-speed railway and municipal roads and airports. The product structure is mature, the variety specifications are complete, the performance quality is stable and reliable. Note: During the construction of cement stabilized soil in the rainy season, special attention should be paid to climate change, do not make the cement and mixture path rain, the construction should be stopped when the rain, but the cement mixture that has been spread should be rolled and compacted as soon as possible, and when the road mixing method is constructed, measures should be taken to exclude the water on the bottom surface, and do not make the aggregate transported to the road too warm. Only the minimum temperature during the construction period should be above 5° C, in the area with ice east, and should be completed half a month to a month before the arrival of the first heavy ice east (-3~-5°0).
(1) Cost saving and high efficiency
Adopt new mixing technology at home and abroad; Motor reducer, double horizontal shaft continuous mixer; Mixing shaft adopts shaft end sealing technology; Can effectively prevent bearing wear caused by leakage; High
production efficiency, cost saving, high value return;
(2) No worries about environmental protection
The use of high-energy bin top dust collector, closed dust removal cement discharge port to form negative pressure to prevent cement leakage in the discharge process; The belt conveyor can be designed to be closed according to customer needs to reduce aggregate drop;
(3) Intelligent technology
Intelligent technology configuration operation control cabinet, operation room; Microcomputer control manual, automatic two forms; Full automatic production, high degree of automation; Background automatic feeding system
integrating the functions of lifting, dividing, storing and feeding;
(4) Modular design
Easy to use, easy to install between modules, automatic control is conducive to saving labor costs; Easy maintenance of the whole machine; The belt conveyor is equipped with bilateral walkways and maintenance platforms, so that the use and maintenance is more humane: (5) accurate measurement
Accuracy less than 1%, in line with national standards; Weighing hopper weighing accuracy of powder and liquid to 1%;
(6) Cement silo
In line with industry standards, the warehouse body is made of steel plate and groove hoop, and the legs are welded with national standard pipe, which is firm and safe. Screw conveyor feeding design: speed regulation variable
frequency metering impeller feeding machine; Material level sensing equipment, can know the use of materials in the warehouse at any time;
WBZ500 stabilized soil mixing station (mixing station), also known as 500 concrete mixing station, can produce 500 tons /, is the advantages of our company's comprehensive domestic similar mixing equipment, combined with the actual needs of construction to produce a new type of road construction floor mat mixing equipment. The equipment is suitable for the construction of any high level highway, high-speed railway and municipal roads and airports. The product structure is mature, the variety specifications are complete, the performance quality is stable and reliable. Note: During the construction of cement stabilized soil in the rainy season, special attention should be paid to climate change, do not make the cement and mixture path rain, the construction should be stopped when the rain, but the cement mixture that has been spread should be rolled and compacted as soon as possible, and when the road mixing method is constructed, measures should be taken to exclude the water on the bottom surface, and do not make the aggregate transported to the road too warm. Only the minimum temperature during the construction period should be above 5° C, in the area with ice east, and should be completed half a month to a month before the arrival of the first heavy ice east (-3~-5°0).
Project | Maximum productivity | Measurement method | Speed regulation mode | control mode | Quantify precision | Power | Weight | |||
WBZ500 | 500t/h | Volume measurement Computer measurement | frequency control Electromagnetic speed regulation | automatic | Manual | aggregate | Powder | water | 155.5kw | 51t |