HZS50 type concrete mixing plant is a simple engineering concrete mixing plant with automatic feeding function, the station adopts modular design, flexible movement, convenient assembly, fast, is Enhong machinery to the urban market for detailed investigation and research, and make special improvements to the complete set of concrete mixing equipment.
HZS50 concrete mixing station is a semi-automatic concrete mixing set equipment composed of feeding, batching, mixing, electric gas control and steel structure components. It is a compulsory, efficient equipment, can produce plastic, dry and hard concrete and other kinds of concrete, high production efficiency, widely used in large and medium-sized building construction, road and bridge engineering and production of concrete products in the prefabrication plant, is the ideal equipment for the production of commercial concrete. The host of the mixing system adopts JS series double horizontal shaft forced mixer, which has good uniformity of mixing concrete, short mixing time, long service life of wearing parts, convenient operation and maintenance. It adopts new design ideas of electronic weighing, microcomputer control, digital display and other control technology, electronic weighing even buffer device and automaticcompensation function, high measurement accuracy. The sand and gravel charging system uses flat belt or herringbone belt charging, with inspection walkway, which is the ideal choice for the majority of construction units to produce high-quality concrete.
The aggregate is discharged into the aggregate metering bucket by the unloading door of the bone bin of the batching station for measurement. After the measurement is completed, the aggregate is unloaded onto the far-rotating flat belt, which is sent to the inclined belt machine, which is transported to the waiting hopper at the upper part of the mixer for instruction. Meanwhile, cement and fly ash are transported to their respective metering buckets by the screw conveyor for measurement. Water and admixtures are respectively sent to the respective metering bucket by the pump and admixture pump for measurement, after the measurement of various materials, the control system issued instructions to begin to feed into the mixer for mixing, after the completion of mixing, open the discharge door of the mixer, the concrete is unloaded into the mixing transport through the discharge hopper, and then enter the next working cycle.
project | Maximum productivity | Mixer model | Batcher model | Discharge height | Working cycle time | Weighing accuracy | |||
HZS50 | 50m3/h | JS1000 | PLD1600 | 3800(mm) | 72(S) | aggregate 2% | cement 1% | water 1% | Additives 1% |